Environment

Environment

In our company engergy central we produce all the necessary energy required for the factory ourselves. The electrical energy is produced by burning natural gas in special power plant. The waste heat produced is used for our drying-process.

For the production of steam a modern energy-saving steam-boiler is available. Apart from all this we also produce electrical energy from our own water-power.

The gelatine manufacturing process produces a high volume of waste water. Water pollution prevention is therefore one of our highest priorities. We pre-filter the waste water before channelling it into the highly modern local purification plant. There the waste water is processed using state-of-the-art technology.

We continuosly strive to do everything in our power to produce our high-quality product without affecting the environment.